Skip to content

Batch Printing Calculator — Time & Cost Savings

Calculate time and cost savings from printing multiple parts in one batch.

How many fit on the bed

Heating, levelling, plate swap

How We Calculate This

Formula

  • Batches needed = Parts needed / Parts per batch (rounded up)
  • Batch print time = Single part time x 1.15 (travel overhead)
  • Total batch time = Batches x (Batch time + Setup time)
  • Time saved = Total single time - Total batch time

Batch printing adds about 15% to the per-part print time due to travel moves between parts, but saves the setup time for each individual print.

Frequently Asked Questions

Last updated: February 2026

All calculations are estimates. Always verify settings with test prints before committing to final prints.